Blog topic
#oee
The six big losses in manufacturing, end to end
Where a plant's productive time really goes: breakdowns, changeovers, minor stops, slow running, scrap and start-up rejects, followed through one shift.
14 Nov 2026 · 3 min read
OEE above 100%? Why a reported OEE can't be right
An OEE over 100% means the inputs are wrong. Here are the common reasons a reported OEE fails the sniff test, from a plant manager's point of view.
26 Oct 2026 · 3 min read